Ethicon Boiler Replacement Design Build Services
Project Profile:
| Project: |
|
600 HP Boiler Replacement |
| Owner: |
|
Ethicon, Inc. |
| Project Type: |
|
Energy and Infrastructure Improvement |
| Project Cost: |
|
$500,000 |
Project Details: When you loose steam for heat in an office building or home, you grab a sweater and deal with it. When you loose steam in a testing lab that is used to control the environment for millions of dollars of research and development, you can’t risk failure.
Challenge: When Ethicon, a J&J Company, looked for a team they could feel confident with to ensure their boiler replacement job would come off successfully, they looked to DES for a turnkey package. Due to the cramped configuration of the boiler room, and the need to maintain steam production through the entire project, DES took a unique approach to system design, equipment selection, creative rigging, backup steam production, and streamlined installation that brought a 600 HP boiler on line, faster than ever expected by the client.
Solution: Our team of engineers and project managers worked closely with Ethicon to ensure all of the challenges for installation were addressed and surmounted in a timely fashion to ensure reliability and production.
Results: Our design build team met the challenge and delivered. When the complexities of delivering a project are keeping you up at night, call us and rest easy. |